Wood Fence Removal

Wood pickets, privacy panels, rails, gates and posts, with visible nails and treated material kept under control for loading.

Two workers carefully lowering a weathered wood fence section

Jobs that fit this scope

  • A weathered privacy fence is failing
  • Old panels must clear before a replacement crew arrives
  • A wood gate and adjoining runs are being removed together

What changes the work

  • wood type and condition
  • nails, screws and attached wire
  • panel size and post spacing
  • treated, painted or mixed material
Two workers carefully lowering a weathered wood fence section
Removed wood fence panels stacked neatly in a residential yard

Before the crew arrives

Confirm that you control the fence or have permission to remove it. Mark the exact run, gates and returns. Move loose yard items out of the path, keep pets away and disclose irrigation, wiring, lighting, vines or structures connected to the fence.

If post or footing work may disturb soil, the location of underground utilities must be handled through the proper California notification process. Do not rely on memory or an old sketch.

Panels are only part of the load.

Gates, posts, concrete, rails, mesh, fasteners and added wire can change both dismantling and hauling. The crew should confirm the visible scope before work begins. Unknown hazardous or contaminated material is outside ordinary fence-debris service.

San Luis Obispo County IWMA says local facilities may accept construction and demolition material, including wood, scrap metal and mixed C&D. Facility acceptance, hours and fees should be checked for the actual load.

Questions about wood fencing

Does the scope include posts?

Post and footing removal should be stated separately. Depth, concrete, access and underground conditions can change the plan.

What should I measure?

Estimate the total length and height, count gates and posts, and measure the narrowest gate or turn between the fence and loading point.

Can material be recycled?

Do not assume a destination. Material condition, contamination and current facility acceptance determine the route.

Show us the fence line, not just one close-up.

Have the approximate length, material, post setting, gates, attachments, access route and intended timing ready when you call.

Call (202) 555-0102